Ensure electrical, hydraulic, pneumatic, sealant and lubrication systems (as applicable) are connected and operational.
Ensure the inlet pipe and pump casing are completely full of liquid before starting continuous duty operation.
Pump submergence
Minimum submergence is required to prevent vortex formation.
The submergence varies in general from 2 to 3 times the nominal bowl diameter and is always specific to each pump model. The submergence needed for adequate NPSH to the first stage impeller may be different from the general rule mentioned earlier.
Location of the first stage impeller eye to be taken into account for minimum priming submergence. It is also equally important to take note of the minimum distance to be maintained to the suction bell from the sump floor (with or without strainer). Therefore, refer to the Flowserve supplied general assembly drawing on minimum submergence or contact Flowserve before the pump is started.
Vertical PWDDFL Multi-suction Sewage Sump Pump
VS6 Vertically Suspended Radial Canned Turbine pump
Vertical turbine Industrial Can-Type Pumps
Semi-submersible Vertical Industrial Turbine Pumps
Semi-submersible Canned Vertical Turbine pump
Short-Set Vertical Turbine pumps
Vertical Cryogenic Process Canned vertical turbine pump
Vertical Canned Process Semi-submersible turbine pump
Canned Vertical Turbine Generators Pump
Vertical long shaft turbine pumps
Semi-submersible Mixed-Flow Vertical Turbine Pumps
Vertical Semi-submersible chemical sump pump
TEL:073184800558 073184810558
Cell Phone:008618507312158 008613974960765
E-mail:sale@ljpump.net
Address:Xiangyin Industrial Park, Jinlong Town, Xiangyin County, Hunan Province, China